Installing a Greenstar Plus Hybrid system
Siting of the external unit
Correct siting, assembly and installation of the individual
components are the fundamental requirements for safe
and economical operation of the Hybrid system. Installation
of the heat pump should be carried out in accordance with
MCS/MIS 3005 & MCS 020 Planning Standards.
Foundation
The installation surface must be level, firm and of
appropriate load-bearing capacity. It must be able to bear
the weight and absorb the vibrations of the external unit
Wooden bases are unsuitable installation areas
Requirements for concrete foundations:
Thickness of concrete: ≥120mm
Load-bearing capacity: ≥320kg
Length of fixing screws: ≥70mm (subject to foundation).
Installation clearances – external unit
1,000mm min.
from front
Rear
32.5mm
400mm
347.5mm
152mm
45.4mm
40mm
18mm
287.5mm
500mm
800mm
69mm
155mm
300mm
330mm
365mm
43.6mm
600mm
300mm
10mm
150mm
23mm
183mm
155mm
90mm
External unit casing dimensions and pipework connections
External unit dimensions
Please see the installation manual for further installation
clearances when in different locations.